Installing The Grafik Eye Qs System - Lutron GRAFIK Eye QS Serie Manual De Montaje Y Utilización

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installing the GRAFIK Eye
1.Mount a 3
1
/
in. (89 mm) deep
2
4-gang U.S. wallbox on a dry, flat
indoor surface that is accessible and
allows for system programming and
operation. Allow at least 4
(110 mm) clearance above and below
the faceplate to ensure proper heat
dissipation. Allow 1 in. (25 mm) for
faceplate overhang on all sides.
Note: 4-gang wallbox available from
Lutron; P/N 241400.
2.Mount the control unit in the wallbox
as shown using the four screws pro-
vided.
Note: Follow all local and national
electrical codes when installing PELV
(Class 2: USA) wiring with line
voltage/mains wiring.
3.Apply the protective overlay to the
control unit. See page 14 for
instructions for naming zones.
Test the Wiring
1.Restore power.
2.Press the top button on the lighting
keypad. The LED will light.
3.Press the zone raise or lower button.
Make sure the control unit is dimming all
connected loads.
R
QS System
®
/
in.
1
2
4.5 in.
(110 mm)
Faceplate overhangs
wallbox on all sides;
allow 1 in. (25 mm)
LUTRON
LUTRON
Protective overlay
(apply after installation)
GRAFIK Eye
7.9 in.
(200 mm)
3.5 in.
(87 mm)
3.75 in.
(95 mm)
Note: When tightening mounting
screws, make sure that the hinged
cover and faceplate will open fully,
as shown.
QS System Installation and Operation Guide 7
®
Wall

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido