Electrical Installation - SICK GSE20 Manual De Instrucciones

Ocultar thumbs Ver también para GSE20:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 40
OPERATING INSTRUCTIONS
5

Electrical installation

en
28
O P E R A T I N G I N S T R U C T I O N S | GSE20
The sensors must be connected in a voltage-free state. The following information must
be observed, depending on the connection type:
Male connector connection: Pin assignment
Cable: Wire color
Terminal connection: Pin assignment
Terminal connection:
1.
Untighten the M3 screw on the back cover and remove the back cover.
2.
Lead voltage-free supply cable through the 3/8" MPT (Male Pipe Thread) fitting,
spacer, rubber seal (as illustrated below) and the back cover opening in the right
position horizontally or vertically.
3.
Connect sensor as per
4.
Put the back cover back and dress the cable.
5.
Tighten the M3 screw and also the 3/8" MPT together with the spacer and rubber
seal.
6.
Seal the other opening with the plastic nut (with rubber) provided in the package.
L (A)
1
2
1
37 mm
52 mm
2
32 mm
47 mm
3
22 mm
37 mm
4
17 mm
32 mm
5
12 mm
27 mm
Only apply voltage and switch on the voltage supply once all electrical connections have
been established.
table
21.
Ø B
C
1
5.8 ... 6.7 mm
2
6.8 ... 7.7 mm
3
7.8 ... 8.2 mm
1
2
3
8026847.1GHF/2022-07-06 | SICK
Subject to change without notice

Publicidad

Tabla de contenido
loading

Tabla de contenido