GreenWorks 2605302 Manual Del Operador página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
3. Remove the 5 screws (24) and side wear pad(26)
that secure the left side cover (31).
24
26
4. Remove the belt (28).
5. Using a socket wrench, remove the large pulley
(29).
English
33
31
28
29
6. Remove the screws (24) that secure the left side
plate.
24
7. Pull the axle (30) and remove the old impeller, install
the new impeller.
12

Publicidad

Tabla de contenido
loading

Tabla de contenido