Install The Upper Handle; Install The Middle Handle; Install The Chute Deflector; Install The Chute Control Rod - GreenWorks 2605302 Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
9.2

INSTALL THE UPPER HANDLE

1. Align the holes in the middle handle (5) and the
upper handle (3).
2. Insert the bolt (14) through the middle handle (5)
and upper handle (3).
3. Tighten the handle knob (15) onto the bolt (14).
4. Repeat for left/right side.
9.3

INSTALL THE MIDDLE HANDLE

1. Align the holes in the middle handle (5) and the
lower handle (6).
2. Put the bolts (14) through the middle handle (5) and
the lower handle (6).
3. Tighten the handle knob (15) onto the bolt (14).
4. Repeat for left/right side.
English
3
5
15
14
5
6
14
15
9.4

INSTALL THE CHUTE DEFLECTOR

12
19
18
1. Align the tabs (18) on to the slots (16) on one side
first.
2. Once you have engaged one tab on one slot push
until you hear a click. Repeat on other side.
3. Push the chute deflector (12).
4. Make sure that the tabs (18) engage the slots (16)
on the two sides.
5. Make sure that the posts (19) engage the holes (17)
on the two sides.
9.5
INSTALL THE CHUTE CONTROL
ROD
22
1. Align the holes (17) in the upper chute control rod
(20) and lower chute control rod (22).
2. Put the hitch pin (21) through the holes (17).
8
16
17
20
21
17

Publicidad

Tabla de contenido
loading

Tabla de contenido