Step 11
Fasten the UPPER DRAWER FRONT (I) to a DRAWER BOX FRONT (D330) on one of the drawers. Fasten the LOWER
å
DRAWER FRONT (J) to a DRAWER BOX FRONT (D330) on the other drawer. Use four 7/8" LARGE HEAD SCREWS (GG)
through the DRAWER BOX FRONTS and into the pre-drilled holes in the DRAWER FRONTS.
NOTE: Pay close attention to the DRAWER FRONTS. The UPPER DRAWER FRONT (I) will overhang the top and bottom
å
of the drawer approximately the same distance. The LOWER DRAWER FRONT (J) will overhang the top of the drawer
approximately 2". Follow the diagrams closely.
Fasten an EXTENSION SLIDE (Q) to each DRAWER SIDE (D357) on both drawers as shown. Use three 7/16" LARGE HEAD
å
SCREWS (JJ) through the third, seventh, and tenth holes from the open end in each SLIDE and into the exact pre-drilled
holes in the DRAWER SIDES. Follow the diagram closely.
Open end
Q
The UPPER DRAWER
FRONT (I) should overhang
the top and bottom of the
drawer approximately the
same distance.
www.sauder.com/services
BLACK 7/8" LARGE HEAD SCREW
(8 used for the DRAWER FRONTS)
D357
I
Q
The LOWER
DRAWER FRONT (J)
should overhang the
top of the drawer
approximately 2".
GG
D357
Q
Open end
D357
J
107302
Open end
BROWN 7/16" LARGE HEAD SCREW
(12 used for the EXTENSION SLIDES)
GG
D357
Q
JJ
Open end
Page 15