BEFORE FIRST USE OF THE ESPRESSO MACHINE
TOP BURR
Step 6. Preparing to Prime Machine
Important: This priming step must be
GRINDER
COLLAR
completed prior to first use.
• Fill Water Reservoir
- Open the Lid and lift upwards using the
Handle inside.
- Fill with cold water from the tap.
- Insert the Water Reservoir into position &
GRINDER
close the Lid.
CLEAN
1. ALIGN
& INSERT
URN
1. ALIGN
& INSERT
HOPPER
GUIDE
ATES OPEN
Note: Make sure that the Water Reservoir
is clean & free of any debris, as any fine
GRINDER
particles can block the water flow.
EAN
INTERLOCK
• Power
- Ensure that the Steam & Hot Water DIAL is
1. ALIGN
GRINDER
& INSERT
in the vertical position.
- Insert the Power Plug into a 127V AC
RN
power outlet & switch the power on.
CLEAN
- Press the ON/OFF BUTTON to turn on the
machine.
- The ON/OFF LIGHT will illuminate & pulse
to indicate the Thermoblock is heating up.
ATES OPEN
- The GRINDER LIGHT will be fully
illuminated from turn on.
- When the ON/OFF, EXTRACTION
BUTTONS & DIAL LIGHTS are all fully
illuminated, the machine is in the READY
MUEVA EL CAFÉ
state for EXTRACTION & DIAL features.
LEAN
ENCENDIDO/
APAGADO
BVSTEM7300-054_19ESM4 (LA).indd 8
MAX
2.8 L
MAX
2.8 L
1 L
1 L
MIN
MIN
BARISTA MAX
MANUAL SHOT
CLEAN
MAX
2.8 L
2.TURN
MAX
2.8 L
1 L
2.TURN
1 L
MIN
MIN
3.HOPPER GATES OPEN
GRINDER
BARISTA MAX
2.TURN
MANUAL SHOT
CLEAN
BARISTA MAX
MANUAL SHOT
READY
PLEASE EMPTY TRAY
MOLINILLO
COLADO
MANUAL
READY
MOLINILLO
• Insert Group Handle
- Insert the Two Cup Filter Basket in the
Group Handle.
- Align the Group Handle with the 'INSERT'
position located on the left of the Group
Head.
- Insert the Group Handle flat against the
Group Head, then turn the Group Handle
right all the way to the centre position.
1. ALIGN
& INSERT
3. CENTER
Note: Turning the Group Handle to the
centre position might be tight for the first few
uses.
Step 7. Prime Espresso Machine
- Press the TWO CUP BUTTON & water
should start flowing from the Group Head.
- Allow water to run through until it stops.
- The machine will return to the READY state.
Note: For the first few seconds the Pump will
make a louder than usual noise as it begins
pumping the water through.
3. CENTER
CLEAN
- Position Steam Wand over the Drip Tray.
- Turn DIAL to HOT WATER.
- Allow water to run through for 20 sec.
- Return DIAL to vertical position.
- The machine will return to the READY state.
- Now the Espresso Machine should be
thoroughly primed.
- Wash Group Handle & Filter Basket in
warm water & dry before making your first
coffee.
- If water is not flowing from the Group Head,
repeat Step 7 one more time.
- If water is still not running through the
Group Head, contact Oster Customer Care.
Details are on the back page.
ENCENDIDO/
APAGADO
English - 8
MAX
2.8 L
MAX
2.8 L
1 L
1 L
MIN
MIN
2.TURN
READY
MOLINILLO
COLADO
MANUAL
3. CENTER
6/26/19 09:33