4. Reposition the terminal block cover and tighten the screws.
5. Close the panel.
N.B.:
• All wiring must be connected as shown on the unit's wiring diagram.
All indoor and outdoor unit cables must be connected by a qualified technician.
•
If the power cable is not long enough, contact the supplier for a new one. Do not attempt to extend
it yourself.
• For air conditioners equipped with a plug, the plug must be easily accessible upon completion of
installation.
• For air conditioners without a plug, install a circuit breaker on the line.
single-pole and the contact gap must be greater than 3mm.
Step eight: bind the pipes
1. Bind together the connecting pipe, the power
cable and the drain pipe with binding tape.
2. Reserve a section of the drain pipe and power
cable for installation when binding. When you
have bound up to a certain point, separate the
indoor power cable and then the drain pipe.
Step nine: hang the indoor unit
1. Insert the bound pipes into the wall pipe and route them through the hole in the wall.
2. Hang the indoor unit on the wall-installation plate.
3. Fill the gap between the pipes and the hole in the wall with sealant.
4. Secure the wall pipe.
5. Check that the indoor unit is securely installed and flush against the wall.
3. Bind them evenly.
4. The liquid pipe and gas pipe must be bound
separately at the end.
N.B.:
The power cable and signal control cable
must not be rolled or coiled.
The
drain pipe must be bound at the bottom.
107
The circuit breaker must be