Descargar Imprimir esta página

Sime P100 BOX Manual Del Usuario página 71

Ocultar thumbs Ver también para P100 BOX:

Publicidad

Idiomas disponibles

Idiomas disponibles

2.10.2 "DEWY EQUIPE P200-P300-P400-P500-P600 BOX" sequence/cascade electrical connections
2.10.3 Installing cascade/sequence control unit supplied with kit code 8096301/08
3
FEATURES
3.1
ELECTRONIC BOARD
Built. according. to. Low. Voltage. directive.
2014/35/UE.and.powered.at.230.Volt,.via.
a. transformer. it. sends. 24. Volt. power. to.
the. following. components:. gas. valve,.
safety. thermostat,. heating. probe,. water.
pressure. transducer. and. air. pressure.
switch.
An. automatic. and. continual. modulation.
system.permits.the.boiler.to.adjust.power.
to.the.various.system.or.user.needs.
Electronic. components. are. guaranteed.
to. operate. in. a. temperature. range. from.
0.to.+60°C.
3.1.1
Malfunctions
The.led.that.signal.errors.and/or.malfun-
ctions.are.indicated.in.fig..14.
3.1.2
Devices
The.electronic.board.is.equipped.with.the.
following.devices:
–. "POT. RISC." trimmer (10.fig..15)
. Adjusts.maximum.heating.power.
. To.increase.the.value,.rotate.the.trim-
Module. are. electrically. connected. to. the. terminal.
board.in.the.shunt.box.
Insert. the. rubber. pipe. of. the. module. that. has. to. be.
connected. into. the. corresponding. hole. on. the. box.
wall..Perform.the.wiring.connections.to.the.junction.
box.as.shown.in.the.layout.of.figure.7/b..
Fix. the. rubber. pipe. to. the. internal. wall. of. the. box.
using.the.straps.provided..
mer.clockwise,.to.reduce.it,.rotate.the.
trimmer.counter-clockwise.
–. "POT. ACC." trimmer (6.fig..15)
. Trimmer.to.vary.the.gas.valve.ignition.
pressure. level. (STEP).. According. to.
the. type. of. gas. the. boiler. is. designed.
for,. the. trimmer. must. be. adjusted. to.
achieve. a. burner. pressure. of. appro-
ximately. 6.5. mm. H
O. for. methane.
2
gas. and. 9.5. mm. H
O. for. propane. gas.
2
(G31).
. To.increase.pressure,.rotate.the.trim-
mer. clockwise,. to. reduce. it,. rotate.
the. trimmer. counter-clockwise.. The.
slow.ignition.pressure.level.can.be.set.
during. the. first. five. seconds. after. the.
burner.is.lit.
After setting the ignition pressure
level (STEP) according to the type of
gas, make sure that the heating gas
pressure is still the previously set
value.
–. ."ANN. RIT." connector (5.fig..15)
. The. electronic. board. is. programmed,.
during.heating,.with.a.technical.burner.
delay. of. about. 90. seconds. that. is. per-
formed. both. at. cold. start. and. subse-
quent.ignitions..This.is.to.prevent.rapid.
Remove. the. two. upper. screws. from. the. shunt.
box. supplied. with. the. box. and. adjust. the. box.
cover.downwards..Remove.the.black.orifice.cap.
and.insert.regulator.RVA.47..Connect.regulator.
RVA. 47. to. the. power. supply,. as. shown. in. the.
layout. of. Figure. 7/b.. After. completing. the. con-
nection,.close.the.box.cover..
ignitions. and. shutdowns. that. could,.
in. particular,. occur. in. systems. with.
high. load. losses.. Each. time. the. boiler.
restarts,. after. the. slow. ignition,. for.
about.1.minute.it.will.run.at.minimum.
modulation. pressure. before. moving. to.
the. set. heating. pressure.. The. addi-
tion. of. a. bridge. will. cancel. both. the.
programmed. technical. delay. and. the.
minimum.pressure.operating.period.at.
ignition..In.this.case,.the.time.between.
shutdown. and. the. next. ignition. will.
depend. on. a. 5°C. differential. detected.
by.the.heating.probe.(SM).
–. DIP SWITCH (13.fig..15)
. For.correct.module.operations,.the.dip.
switches.must.be.positioned.as.indica-
ted.below:
–. "Modureg Sel." connector (14.fig..15)
. The.bridge.must.always.be.connected.
–. "Albatros" connector (15.fig..15)
. The.bridge.must.always.be.off.
IT
ES
ENG
Fig..12
Fig..12/a
71

Publicidad

loading

Este manual también es adecuado para:

P200 boxP300 boxP400 boxP500 boxP600 box