Test Notes; Tests Before The First Commissioning - SICK L 4000 Manual De Instrucciones

Ocultar thumbs Ver también para L 4000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 118
Operating Instructions
L 4000 system
Fig. 20: L 4000 (M30)
alignment aid adapter for
AR 60
8010009/TI69/2009-11-26
Commissioning
6.3

Test notes

6.3.1 Tests before the first commissioning

The purpose of the tests before the first commissioning is to confirm
the safety requirements specified in the national/international rules
and regulations, especially in the Machine and Equipment Usage Di-
rective (EU Conformity).
To ensure correct function, test as defined in chapter 6.3.2 "Daily
functional checks of the protective device".
Number of senders and receivers must match, the distance be-
tween them must not exceed the maximum value given in the
technical specifications.
Access to the hazardous point must only be possible through the
protective field.
It must not be possible to climb over, creep underneath or pass
around the protective device.
Also test the effectiveness of the protective device mounted on the
machine using all selectable operating modes as specified in the
checklist (see chapter 11.2 on page 328). Use this checklist as a
reference before commissioning the system for the first time.
© SICK AG • Industrial Safety Systems • Germany • All rights reserved
L 4000
Alignment aid adapter
Chapter 6
AR 60
311

Publicidad

Tabla de contenido
loading

Tabla de contenido