2.5.1 - E lectronic configuration for lower or upper wall installations
Work as follows (see fig. 28):
Delicately open the flap and detach it
a.
from its side and central hooks on the
deflectors.
b.
Remove the pin (P1) and rotate the
flap 180°.
c.
Insert the pin (P1) on the right side of
the flap.
Re-insert the flap by inserting the pin (P1) in the lower hole located on the right
d.
of the opening (P2) and insert the pin already located in the appliance in the
lower hole located on the left of the opening.
Upper wall configuration determines an automatic correction of
the room temperature equal to 3°c in heating mode.
For correct functionality, each modification of the configuration of
the air outlet flap must correspond to the relative modification of
the electronic configuration.
After performing the mechanical operations for changing the air outlet flap, it is nec-
essary to configure the control electronics of the machine (see fig.29):
a.
Connect the power supply line.
b.
Make sure the machine is in stand-by, LED A on.
c.
Keep the reset button H pressed until an acoustic signal sounds.
d. HIGH WALL CONFIGU-
RATION: press and hold
button H again until LED
C (yellow) lights up.
FLOOR CONFIGURA-
TION: press and hold
button H again until LED
B (green) lights up.
Release the display button H and wait a few seconds until the stand-by config-
e.
uration is restored, LED A on.
3 - USE
3.1 - WARNINGS
The installation and electrical connection of the air conditioner
should be carried out by specialized personnel who possess the
28
29
P1
EN - 23
UNICO