Technical Data - Grohe 36 289 Manual De Instrucciones

Ocultar thumbs Ver también para 36 289:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
GB
Safety notes
Prevent danger resulting from damaged voltage supply cables.
If damaged, the voltage supply cable must be replaced by the
manufacturer or his customer service department or an equally
qualified person.
• Installation is only possible in frost-free rooms.
• The optional voltage supply unit is only suitable for indoor use.
• The plug-in connectors must not be directly or indirectly sprayed with
water when cleaning.
• The voltage supply must be separately switchable.
• Use only genuine replacement parts and accessories. The use of
other parts will result in voiding of the warranty and the CE identification,
and could lead to injuries.
Application
Thermostatic mixers are designed for hot water supplies from pressurised
storage heaters and offer the highest temperature accuracy when used in
this way. With sufficient power output (from 18 kW or 250 kcal/min),
electric or gas instantaneous heaters are also suitable.
Thermostats cannot be used in connection with unpressurised storage
heaters.
All thermostats are adjusted in the factory at a flow pressure of 0.3 MPa
on both sides.
Operating conditions
The maximum permissible distance between the digital controller/diverter
of the functional unit and the transceiver is 5 m. The best wireless
reception is achieved when the transceiver is surface-mounted.
Sources of interferences
The transceiver operates in the ISM-frequency range (2.4GHz). The
installation in the vicinity of equipment with the same channel occupancy
(eg wireless devices, RF components, etc. [observe the manufacturer´s
documentation!]) should be avoided.
Obstructions/barriers
For operation under adverse environments, in buildings / rooms with
reinforced concrete walls, steel and iron frame, or near of obstructions
(eg furniture) of metal, the radio reception can be disturbed and
interrupted.
Kind of obstructions
Wood, synthetic material
Water, brick, marble
Plaster, concrete, glass, solid wood
Metal

Technical data

• Flow pressure
- Minimum flow pressure without downstream resistances:
- Minimum flow pressure with downstream resistances:
- Recommended
• Operating pressure
• Test pressure
If static pressure exceeds 0.5 MPa a pressure-reducing valve must be
fitted.
Avoid major pressure differences between hot and cold water supply.
• Flow rate at 0.3 MPa flow pressure
(with simultaneous use of all outlets):
• Minimum flow rate:
• Hot water supply temperature:
- Recommended (energy saving):
- Thermal disinfection possible
• Hot water temperature at supply connection min. 2 °C higher than mixed
water temperature.
• Ambient temperature:
• Voltage supply:
• Power consumption:
• Radio frequency:
• Transmitter power:
• Digital controller battery:
3x 3 V lithium batteries (type CR 2450)
• Automatic safety shut-off (factory setting):
Please pass these instructions on to the fitting user!
5
The right to make technical modifications is reserved!
• Safety stop (factory setting):
• Maximal temperature:
• Type of protection:
• Water connection:
Electrical test data
• Software class:
• Contamination class:
• Rated surge voltage:
• Temperature for ball impact test:
The test for electromagnetic compatibility (interference emission test) was
performed at the rated voltage and rated current.
Approval and conformity
The conformity declarations can be obtained from the following address:
GROHE Deutschland Vertriebs GmbH
Zur Porta 9
D-32457 Porta Westfalica
Electrical installation
Rough installation
• The functional unit must be accessible for maintenance work,
• The plug-in connectors and the transceiver must be accessible.
• The functional unit must not be installed with the lid facing downwards.
• A vacant tube must be used to connect the functional unit to the voltage
Prepare the wall for the installation, refer to the dimensional drawing on
Interference or shielding
fold-out page I and Figs. [1] to [3] on fold-out page II.
potential
- Prepare holes for the functional unit as well as slots for the pipes and
Low
Medium
Flush pipes thoroughly before and after installation (observe EN 806).
High
Install functional unit, see fold-out page II, Figs. [4] to [7].
Very high
- Route the mixed water outlet to the points of discharge, outlet 1 must
0.1 MPa
- For sealing a unused outlet the supplied plug (A) can be used.
0.2 MPa
Flush the functional unit, see fold-out page II, Fig. [8] and fold-out
0.2 – 0.5 MPa
page III, Figs. [9] and [10].
max. 1.0 MPa
Close the cold and hot water supply. Assemble in reverse order.
1.6 MPa
Final installation
Insert batteries into digital controller/diverter, see fold-out page III,
Figs. [11] to [15]. Grease seals. Insert batteries with correct polarity.
The digital controller/diverter is registered with the functional unit in the
approx. 50 l/min
factory.
5 l/min
min. 50 °C - max. 70 °C
Secure digital controller/diverter, see Fig. [16a] or [16b] to [19].
60 °C
Open the hot and cold water supply and check that the connections
are watertight.
Establish voltage supply via voltage supply unit (not included in the
scope of delivery), see fold-out page IV, Fig. [20].
max. 40 °C
The indicator lamp (B) of the transceiver then flashes one after another
230 V AC, 50/60 Hz
blue, green and red.
9 VA
The buttons of the digital controller/diverter are now inoperative for 3
2.4332 GHz (channel 5-6)
minutes.
< 1 mW
20 min
- Functional unit
- Digital controller/diverter
- Transceiver
This product conforms to the requirements of the relevant EU
directives.
Electrical installation work must only be performed by a
qualified electrician. This work must be carried out in
accordance with the regulations to IEC 60364-7-701
(corresponding to VDE 0100 Part 701) as well as all national
and local regulations.
Required dimensions inspection chamber, see fold-out page II, Fig. [1]
to [3].
To simplify the maintenance, GROHE recommends the installation of
isolating valves and detachable connections in the inspection chamber.
supply unit and to the transceiver.
empty conduit.
be engaged mandatory, see Fig. [5].
Do not solder the connections.
38 °C
46 °C
IP 40
IP X5
IP X5
COLD/HOT
B
2
2500 V
100 °C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

36 29236 295

Tabla de contenido