1 - MAINTENANCE WORK
Maintenance work must be carried out by the
installer or a qualified individual to guarantee the
installation's operation and safety.
The
number
of
maintenance
operations must be proportional to the frequency
the motorised gate is used.
For use of about 10 cycles per day, it is necessary
to provide:
• maintenance of the mechanical parts every 12
months: tightening screws, lubrication, checking
the hinges, stops and gate balance, etc.
• maintenance of the electronic parts every 6
months: engine operation, photocells, control
devices, etc.
2 - OPERATING INDICATORS
This system has two operating indicators: the
battery charge level (optional) and the history of
events.
OK
PROG
and
upkeep
OK 3s
efface historique
PROG
OK
L1
L2
L3
L4
Charge batterie
F - MAINTENANCE AND UPKEEP
historique des événements
L1
L2
Code 4
–
L1
L2
Code 3
–
L1
L2
Code 2
–
OK
L1
L2
Code 1
L3
L4
+
L3
L4
du plus
récent
+
au plus
ancien
L3
L4
+
L3
L4
35
EN