Descargar Imprimir esta página

Waeco AirCon Service Center Instrucciones De Uso página 86

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Operation
✓ A request appears asking you to check the air conditioning system:
6. Check the high and low pressure of the air conditioning system in
accordance with the manufacturer's specifications.
7. To end the air conditioning system test, press Stop.
ASC2000RPA only: if applicable, the message "NCG evacuation"
appears in the display (6) once the recycling phase has been completed.
Non-condensable gases (such as air or oxygen) are automatically
released into the surrounding air.
8. Close the HP quick coupling and detach it from the air conditioning
system.
If you have turned off the vehicle engine to uncouple the HP quick
coupling, restart the engine and turn on the air conditioning.
✓ The following display messages are shown:
9. To end the air conditioning test, press the "Stop" button.
86
Check the A/C system
STOP-EXIT
Remove HP
quick coupling
from air conditioning.
ENTER-OK
Wait !
Recovery from the
service hoses.
Process completed.
STOP-EXIT
AirConServiceCenter

Publicidad

loading

Este manual también es adecuado para:

Asc 1000Asc 2000Asc 2000 rpaAsc 3000