Vertical installation of the UVC clarifier
Use suitable fastening material (screws, dowels) for assembly.
• Select the fastening material so that the unit is stable. Take the weight of the water-filled
unit into account. (→ Unit data)
How to proceed:
1. On the ground, mark the positions for the screws.
2. Drill holes and screw the unit to the ground.
3. Connect the inlet and outlet.
– Assembly material, inlet (IN): OASE accessories 73751, 77191 and hose ∅ 50 mm to the pump
– Assembly material, outlet (OUT): OASE accessories 73751 for connection of pipe DN 110.
– Secure pipe DN 110 against slipping.
4. Bitron Premium 120 W /180 W: Fasten the switch box on the water housing. (→ Installing the
switch box)
40
BTN0065