3. Installation
3.1 Right place for installation
Contact the Authorized Service for
the product's installation. To ready
the product for installation, see the
information in the user guide and
make sure the electric and water
utilities are as required. If not,
call an electrician and plumber to
arrange the utilities as necessary.
B
B
A
• If the product will be placed in an
alcove, remember to leave at least 5
cm clearance between the product
and the ceiling, rear wall and the
side walls. Check if the rear wall
clearance protection component is
present at its location (if provided
with the product). If the component
is not available, or if it is lost or
fallen, position the product so that
at least 5 cm clearance shall be
12
WARNING:
The
manufacturer assumes
no responsibility for
any damage caused by
the work carried out by
unauthorized persons.
WARNING:
The
product's power cable
must be unplugged
during installation.
Failure to do so may
result in death or
serious injuries!
WARNING:
If the door
span is too narrow
for the product to
pass, remove the door
and turn the product
sideways; if this does
not work, contact the
authorized service.
left between the rear surface of
the product and the wall of the
the product.
room. The clearance at the rear is
important for efficient operation of
3.2 Attaching the plastic wedges
Use the plastic wedges in the
provided with the product to provide
sufficient space for air circulation
between the product and the wall.
1.
To attach the wedges, remove
the screws on the product and
use the screws provided with
the wedges.
2.
Attach 2 plastic wedges on the
ventilation cover shown as j in
the figure.