12.8 Replacement of the generator pressure switch
For equipment with the program "A" and "L" there are 2 pressure switches, the first is located at the top of the
right column when the left side finish is removed. The second is located attached to the steam generator.
For equipment with the "B" program, only 1 pressure switch is located attached to the steam generator.
Disconnect the electrical power from the mains before starting the component replacement.
Ensure that there is no pressure in the steam generator.
To replace the pressure switch, proceed as follows:
With the sterilizer off, open the side trim using the key provided with the equipment;
Access the steam generator pressure switch;
Remove the pressure switch cover with the aid of a screwdriver;
Remove the connected cables with the aid of a screwdriver;
Remove the steam hose using a fixed wrench;
Remove the screws fixing the pressure switch;
Remove the pressure switch;
Reposition the new pressure switch and fix the screws;
Reposition the steam hose and cables and reconnect;
Close the pressure switch cover;
Turn on the equipment and test the pressure switch to validate its operation.
The replaced pressure switch must be calibrated.
12.9 Replacement of the steam pressure switch
Only equipment with program "B" has a steam pressure switch that is located above the equipment chamber.
Disconnect the electrical power from the mains before starting the component replacement.
Ensure that there is no pressure in the steam generator.
Maintenance Manual
Steam Sterilizer
HI SPEED II
Figure 29 - Steam generator pressure switch
Code: MM.01.09.0003
Version / Revision: 3.001
Page: 38 of 81