Ivoclar Vivadent IPS Investment Ring System 300 g Instrucciones De Uso página 4

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
IPS InLine PoM
Number
3x
of Ingots
XS
Wax weight
max.
1.4 g
Remove the investment ring from the preheating furnace
immediately after completion of the preheating cycle. This step
may take max. 1 minute to prevent the investment ring from
cooling down too much.
– Place the cold ingots in the hot investment ring using the
IPS Ingot Tongs.
– Place the IPS One-Way plunger in the hot investment ring.
– Place the completed investment ring in the center of the
hot press furnace using the investment tongs.
– The selected press program is started by pressing "START"
– After the press cycle has ended, immediately remove the
investment ring and place it on a cooling grid.
maximum number of ingots
IPS e.max ZirPress ingots or
IPS Inline PoM ingots
IPS One-Way-Plunger 300 g
Press parameters for IPS e.max ZirPress
(Please observe the parameters for your press furnace!)
Press
B
Furnaces
°C
EP500 (V2.9) 700
60
EP600 /
700
60
EP600 Combi
EP 3000
700
60
EP 5000
700
60
4
6x
3x
6x
XS
S
S
max.
max.
max.
3.0 g
2.1 g
5.1 g
IPS Investment Ring System 300 g
6 ingots
cold ingots
cold plunger
T
H
V
V
1
°C/min
°C
min
°C
940
40
500
940
930
40
500
930
930
40
500
930
930
40
500
930
Press parameters for IPS Inline PoM
(Please observe the parameters for your press furnace!)
3x XS +
3x S
Press
max.
Furnace
4.1 g
EP500 (V2.9) 700
EP600 /
EP600 Combi
EP 3000
EP 5000
Divesting
Once the investment ring has cooled to room temperature
(approx. 60 minutes), divest as follows:
– Mark the length of the plunger on the cooled investment
ring.
– Separate the investment ring using a separating disk. This
predetermined breaking point enables reliable separation
of the investment material and the ceramic.
– Break the investment ring at the predetermined breaking
point using a plaster knife.
– Always use polishing beads to divest the pressed objects.
Do not use Al
– Rough divestment is carried out at 4 bar (60 psi) pressure,
while fine divestment is done at 2 bar (30 psi) pressure.
– Observe the blasting direction and distance to prevent
damage to the object margins during divestment.
Note
For long-span restorations,...
– it is recommended to cut the sprues while the restoration
is still in the investment
ring in order to relieve
tensions before final
divestment.
– make sure not to damage
the restoration when
cutting the various sprues.
Date information prepared:
09/2008
A
2
°C
Manufacturer:
Ivoclar Vivadent AG, FL-9494 Schaan / Liechtenstein
Progr.
31-51
The material has been developed solely for use in dentistry. Processing should be carried out
250
strictly according to the Instructions for Use. Liability cannot be accepted for damages resulting
from failure to observe the Instructions or the stipulated area of application. The user is
µm/min
responsible for testing the material for its suitability and use for any purpose not explicitly sta-
ted in the Instructions. Descriptions and data constitute no warranty of attributes and are not
250
binding.
µm/min
250
µm/min
B
T
H
°C
°C/min
°C
60
960
40
700
60
950
40
700
60
950
40
700
60
950
40
O
for rough and fine divestment.
2
3
V
V
A
1
2
min
°C
°C
Progr.
500
960
31-51
50
500
950
µm/min.
50
500
950
µm/min.
50
500
950
µm/min.

Publicidad

Tabla de contenido
loading

Tabla de contenido