Descargar Imprimir esta página

DJI DOCK 2 Guía De Instalación Rápida página 5

Ocultar thumbs Ver también para DOCK 2:

Publicidad

1. Place the box lid with the installation hole markers facing upward at the location where the dock will be
installed, and adjust the orientation and position accordingly.
2. Align the hammer drill (drill diameter Ф12 mm) with the installation hole markers, keep the hammer drill
perpendicular to the earth and drill four installation holes with a depth of 60 mm. Remove the box lid after
drilling and make sure to clean up surrounding debris to avoid having it fall into the holes.
3. Slightly tighten the nuts of the four expansion bolts provided, place them into the installation holes, and
tap the bolts with a claw hammer until the expansion tubes are inserted into the installation holes.
4. After pre-tightening the screw bolt until it cannot be tightened further, unscrew the nut, spring washer,
and flat washer.
536mm
465.5mm
交流输入
接地线
网络输入
AC-IN
EARTH WIRE
LAN-IN
Mounting the Base Brackets
• When aligning the expansion bolt holes with the mounting base brackets, DO NOT put your hands
under the mounting base brackets when moving the dock in order to avoid injury.
1. Carefully lift the dock by the carrying points and move it to the installation location. Align the four
mounting base bracket holes with the expansion bolts, and then place it down slowly. It is recommended
that at least two people carry the dock.
2. Place the digital level on top of one of the dock covers to make sure that the dock is horizontally level. If
the dock is not level and the degree of incline exceeds 3 degrees, use metal gaskets or other materials to
raise the base brackets accordingly.
3. Install the flat washer, spring washer, and nut of the expansion bolt in sequence, and tighten the nut with
an adjustable wrench.
1
• Make sure to lift the dock by the carrying points when moving it.
• DO NOT place the digital level across both dock covers when measuring.
4
90°
Ф12 mm
60 mm
3
2

Publicidad

loading