Plumbing Requirements - Scotsman C1448R Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

C1448, C1848, C2148
Remote Condenser Models - Installation Manual

Plumbing Requirements

All models require connection to cold, potable
water. A hand actuated valve within site of the
machine is required. There is a single 3/4 gas
BSPP inlet water connection.
Water Filters: Install a new cartridge if the filters
were used with a prior machine.
Drains.: All models require drain tubing to be
attached to them. There is a single ¾" FPT drain
fitting in the back of the cabinet.
Install new tubing when replacing a prior ice
machine, as the tubing will have been sized for the
old model and might not be correct for this one.
1. Connect water supply to water inlet fittings.
Water Inlet
Connection
Potable Water
Supply
Optional Water
Filters
Floor Drain
2. Connect drain tubing to drain fitting.
3. Route the drain tubing to building drain. Follow
4. Use rigid drain tubes and route them
Vent the reservoir drain. A vertical vent at the back
of the drain, extended about 200 mm will allow the
gravity drain to empty and also keep any surges
during draining from discharging water.
Horizontal runs of drain tubing need a 20 mm fall
per meter of run for proper draining.
Follow all applicable codes.
Water Supply and Drain Connections
June 2007
Page 12
local codes for air gap.
separately – do not Tee into the bin's drain.
Warning: Connect only to potable water
Reservoir
Drain, Venting
Required

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

C1848rC2148r

Tabla de contenido