Installation Requirements - Hofmann monty 1620 Manual Del Operador

Desmontador semi-automático de neumáticos
Tabla de contenido

Publicidad

58
monty 1620 - 1625
i-1
i . I n s t a l l a t i o n r e q u i r e m e n t s
THE INSTALLATION SHALL BE CARRIED OUT
ONLY BY QUALIFIED PERSONNEL AND WITHIN
THE SCOPE OF THE INSTRUCTIONS PROVIDED
IN THIS MANUAL.
Install the machine in a covered and dry area.
The installation of the machine requires a free space
of at least 106"x106" (270x270cm) (Fig.i-1).
Make sure that from the operating position the user
can see all of the machine and the surrounding area.
The operator shall forbid, in such an area, the presence
of non authorized persons and of objects which may
create possible hazards.
The machine shall be installed on a horizontal fl oor
preferably even. Do not install the machine on a sinking
or irregular fl oor.
If the machine is installed on a raised fl oor, the fl oor
must have a capacity of at least 110lbsxsqft (5000 N/
m² o 500 kg/m²). The machine must be secured to
the fl oor through the holes provided in the cabinet.
Expansion screws 12x120mm shall be used.
Drill 12mm holes in the fl oor fl ush with the holes
provided in the cabinet.
Place the nogs into the holes drilled in the fl oor and
move the machine so that the holes of the cabinet are
fl ush with the holes in the fl oor. Tighten the screws at
51 ft
lb (70 Nm).
x
Operator's Manual

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Monty 1625

Tabla de contenido