Electrical Connection; Test Procedures; Instructing The Operator - John Bean B340 Manual Do Operador

Tabla de contenido

Publicidad

1
156
iii-5
Installation

Electrical Connection

Figure iii-5 Power Supply
Caution
Before connecting the electronic cables turn off the
mains switch.
— Plug in the plug (1, Fig.iii-5) of the power supply
cable.
iv Test procedures
• Balance a wheel to less than 0.25 oz. (5 grams) per
• Balance a wheel until obtaining an unbalance less
plane.
than 5 grams (0.25 oz.) per plane.
• Perform a User Calibration,
v Instructing the operator
(Following applies only if a unit is installed by a service
Technician)
• Show and explain the Safety Booklet.
• Show the operator how to switch the unit on and
off.
• Show the operator how to perform an emergency
stop.
• Show the operator how to select a wheel type, enter
data and apply a weight.
6.2.
F

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

B340lEewb331a

Tabla de contenido