John Bean B340 Manual Do Operador página 50

Tabla de contenido

Publicidad

1
50
5-9
5-10
5-11
Operation
5.4
Preparation
• The operator should be familiar with the warnings
and cautions
• The operator should be qualifi ed to work with the
machine.
• Alwaysensure that the wheel guard is lifted and the
gauge arm is in its home position (fully retracted).
5.4.1
Power up
• Do not keep any key pressed during power up.
Refer to (Fig. 5-9).
• Insert the power cable plug in the mains socket "1".
• Set the start switch to the "I" position.
Note:
If the unit beeps and does not proceed or
if an error code is shown, refer to Chapter
(
7).
F
The unit will beep and perform a self-test now.
After switch on the fi rst screen page shown is INTRO
SCREEN (Fig. 5-10).
The unit is now ready for commands.
Note:
From the INTRO SCREENpage, you
can switch directly to the RIM DATA
ENTRY screen page (Fig. 5-11) by simply
removing the detecting device for wheel
data acquisition.

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

B340lEewb331a

Tabla de contenido