GE Uniflux 10 Instrucciones De Funcionamiento página 238

Tabla de contenido

Publicidad

B Create a method with UNICORN 6 and above
B.2 An example of using the Method Editor
B.2.4 Phase 2: Product Transfer
Step
2
3
4
5
6
7
Instruction: Permeate outlets
Step
1
2
3
4
238
Action
In the Instruction Box:
Set Breakpoint to 0.00 min.
In the Instructions: list, select Recirc.
Select Feed, set to Open, click Insert.
Select Feed_Drain, set to Closed, click Insert.
Select IntegrityTestValve, set to Closed, click Insert.
Select Retentate_Control_Valve_PCV341, set to 100%, click Insert.
Select Retentate, set to Retentate, click Insert.
Action
In the Text Instructions tab, select the Base: SameAsMain instruction of the
Block: PROD_TRANSFER_FLOWPATH block.
In the Instruction Box:
Set Breakpoint to 0.00 min.
In the Instructions: list, select Permeate.
Select Permeate, set to Closed, click Insert.
Select Permeate_Drain, set to Closed, click Insert.
UniFlux 10 Instrucciones de funcionamiento 28993587 AE

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido