Block 2: Product Transfer - GE Uniflux 10 Instrucciones De Funcionamiento

Tabla de contenido

Publicidad

A Create a method with UNICORN 5
A.2 An example of using the Method Editor
A.2.4 Block 2: Product transfer
A.2.4

Block 2: Product transfer

Purpose and structure
The second block in the method will fill the tank with the solution to be processed.
This block will contain nested blocks.
Block: Product transfer
Step
1
2
3
Nested block: Product transfer
path
Step
1
2
3
200
Action
In the Text pane, select the Base Time instruction of the Main node.
In the Method Editor menu, select Block:New.
In the New Block dialog:
In the Name field, type an appropriate name, for instance
PRODUCT_TRANSFER.
In the Base group box, select Time.
In the Call group box, select Main.
Click OK to insert the new block.
Action
In the Text pane, select the Base Time instruction of the Block
PRODUCT_TRANSFER block.
In the Method Editor menu, select Block:New.
In the New Block dialog:
In the Name field, type an appropriate name, for instance
PRODUCT_TRANSFER_FLOWPATH.
In the Base group box, select Time.
In the Call group box, select Block PRODUCT_TRANSFER.
Click OK to insert the new block.
The new block will be placed inside the Block PRODUCT_TRANSFER block.
UniFlux 10 Instrucciones de funcionamiento 28993587 AE

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido