GE Uniflux 10 Instrucciones De Funcionamiento página 240

Tabla de contenido

Publicidad

B Create a method with UNICORN 6 and above
B.2 An example of using the Method Editor
B.2.4 Phase 2: Product Transfer
Step
2
3
4
Nested block: Start and stop the
product transfer
Step
1
2
240
Action
In the Instruction Box, do the following settings:
Set Breakpoint to 0.00 min.
In the Instructions: list, select Other and Block.
In the Parameters for field, type an appropriate name, for instance
DELAY_3_SEC.
Click the Insert button.
The new block will be placed inside the Block: PROD_TRANSFER_FLOWPATH
block.
In the Text Instructions tab, select the End_Block instruction of the Block:
DELAY_3_SEC block.
In the Instruction Box:
Set Breakpoint to 0.05 min (equals 3 seconds).
Click the Change button.
Action
In the Text Instructions tab, select the Block: PROD_TRANSFER_FLOWPATH
instruction of the Phase: Product transfer phase.
In the Instruction Box, do the following settings:
Set Breakpoint to 0.00 min.
In the Instructions: list, select Other and Block.
In the Parameters for field, type an appropriate name, for instance
PROD_TRANSFER_VOLUME.
Click the Insert button.
UniFlux 10 Instrucciones de funcionamiento 28993587 AE

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido