Descargar Imprimir esta página

Scope Of Delivery; Tools Required; Installing The Rf Receiver - Waeco MAGIC TOUCH MT-350 Instrucciones De Montaje

Publicidad

158

Scope of delivery

No.
Quantity
Description
(see ✎ B ➀)
1
RF receiver
(see ✎ B ➁)
2
RF hand transmitter
(see ✎ B ➂)
1
Connection cable for receiver

Tools required

Needed/required for installation:
– Measure
(see ✎ C ➀) – Drill bits
– Prick punch
(see ✎ C ➁) – Drill
– Hammer
(see ✎ C ➂) – Screwdrivers
Für den elektrischen Anschluss und Überprüfung wird benötigt:
– Diode test lamp (see ✎ D ➀) – Heat shrinkable tubing
or voltmeter
(see ✎ D ➁) – Hot blow drier
– Crimping pliers (see ✎ D ➂) – Soldering iron
– Insulation tape
– Solder
For securing the receiver and cables, you may also need bolts,
metal screws and cable binders.

Installing the RF receiver

Locate a suitable place for installing the RF receiver. Suitable
places for installation (see✎ E ➀) are under the dashboard, behind
the centre instrument panel or behind the glove compartment.
Please note the following when choosing the place of installation:
– Fit the RF receiver in such a position that it is easily accessible in order
to allow the reprogramming of hand transmitters.
– Do not fit the receiver next to other control devices, as this may cause
mutual interference and also result in malfunction and a reduction in the
operating range of the radio remote control.
Article No.
Art. No MT-350RX
Art. No MT-650TX
Art. No MT-350KA
(see ✎ C ➃)
(see ✎ C ➄)
(see ✎ C ➅)
(see ✎ D ➃)
(see ✎ D ➄)
(see ✎ D ➅)
43

Publicidad

Capítulos

loading