Burner Installation; Hydraulic Circuit; Electrical Connections; Priming And Adjustment Of Oil Pump - Ecoflam MAIOR P 500.1 PR Instruccion De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
420010351103 Maior P 500/600 PR
EN
1
-
HOSE
2
-
OIL FILTER
3
-
OIL COCK
4
-
SUCTION
5
-
RETURN
1
1
2
All burners are factory tested at 400V - 50Hz 3-phase for motors, and 230V - 50Hz single phase with neutral for
auxiliary equipments. Should it be necessary to power the burner with 230V - 50Hz, modify the connections on
motor and the terminal board as shown in the picture. Protect the burner supply line with suitable fuses and/or other
safety devices as required by the local regulations on the matter.
SUNTEC TA...C4
4
1
5
2
The pump pressure is set at a value of 22-24 bar during the testing of burners. Before starting the burner, bleed the
air in the pump through the gauge port. Fill the piping with light-oil to facilitate the pump priming. Start the burner
and check the pump feeding pressure. In case the pump priming does not take place during the first prepurging, with
a consequent, subsequent lock-out of the burner, rearm the burner's lock-out to restart, by pushing the button on the
control box. If, after a successful pump priming, the burner locks-out after the prepurging, due to a fuel pressure drop
in the pump, rearm the burner's lock-out to restart the burner. Do never allow the pump working without oil for more
than three minutes. Note: before starting the burner, check that the return pipe is open. An eventual obstruction could
damage the pump sealing device.

BURNER INSTALLATION

1
2
3
4 5

HYDRAULIC CIRCUIT

A
R
3

ELECTRICAL CONNECTIONS

PRIMING AND ADJUSTMENT OF OIL PUMP

1 - INLET
3
2 - RETURN
3 - BLEED AND PRESSURE GAUGE PORT
4 - VACUUM GAUGE PORT
6
5 - PRESSURE ADJUSTMENT
6 - TO NOZZLE
VERIFY:
- That piping system is perfectly sealed;
- That the use of hoses is avoided whenever is possible (use copper pipes prefe-
rably);
- That depression is not greater than 0,45 bar, to avoid pump's cavitation;
- That check valve is suitably designed for the duty;
1 - BURNER
6
2 - NUT
7
3 - WASHER
4 - GASKET
5 - BOLT
6 - BOILER
7 - GASKET
VS
VL
- 10 -

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Maior p 600.1 pr

Tabla de contenido