(with a volume of 10 litres, in the case of the 18kW model, and of 16 litres, in the
case of the 24kW and 30kW models) with a pre-charge pressure of 1.0 bar, as well
as a 3 bar safety valve;
* Operating pressure is between 1 and 1.5 bars;
* To empty the unit, attach a "T-tube" with a tap to the outlet (connected to the
household sewage); the safety valve (3 bar) outlet
must also be connected to the household sewage;
* The heat transporting fluid must consist of water mixed with an anti-corrosion, non-
toxic product added in the quantity recommended by the manufacturer. If there exists
any risk of freezing in the space where the boiler is installed, or within its fluid pipes,
the installation engineer must add the manufacturer's recommended quantity of anti-
freeze agent to the circulating fluid, in order to avoid freezing at the absolute
minimum expected temperature.
4.6. Operating mode for radiator/Buffer tank
IMPORTANT! The boiler is programmed to work directly for radiators, in case
you want to install the boiler with a buffer or AQS tank, we recommend changing the
temperature "OFF" of the circulation pump by placing the same temperature as the
deposit or 1 °C higher than this temperature, should disable the "hYDRO Menu"
modes "Modulating Pump" and "hydro independent" and switch the mode display
"Auto" to "Manual" mode and select the power 5 (Fire 5).
You must change the smoke temperatures ("Toff" and "Ton") in the "Activation" menu.
For these changes is necessary to access the "Installer Menu" on the display, please
request a password manufactures.
5.
Fuel
The boiler must be exclusively fuelled by pellets. No other fuel may be used.
Use onlypellets certified by standard EN 14961-2 grade A1, 6mm
in diameter and a length between 10-30mm.
15