Hydraulic Installation - Baxi CBP Matic 18 Manual De Instrucciones

Caldera de pellets
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

A "T"-tube must be attached to the base of the piping to allow for periodic inspections
and annual maintenance, as illustrated in Figure 7.
O interior mínimo: 100mm
Inspección
Figure 7 – Side view of the boiler installation with a shaft, highlighting the inspection point.
It is recommended that the boiler not be used during adverse weather conditions that
may seriously disrupt the unit's fume extraction capacity (this is especially the case
with very strong winds).
If you do not use the unit for a long time, check it to make sure that the flue pipes are
clear before lighting the fire.

4.5. Hydraulic Installation

* Chapter 12 (installation diagrams) includes diagrams illustrating the range of
possible connections that may be used in the installation of a central heating system,
with or without the feature of heating water for domestic use;
* The pellet-run boiler comes equipped with a circulating pump, an expansion tank
14

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cbp matic 24Cbp matic 30

Tabla de contenido