Installation Requirements - Baxi CBP Matic 18 Manual De Instrucciones

Caldera de pellets
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.1

Installation requirements

The minimum distance required between the pellet-run boiler and any highly
flammable surfaces is found specified in 4.
The top of the boiler must be at a distance of at least 100 cms from the ceiling,
especially in rooms with ceilings composed of flammable materials.
The base supporting the boiler cannot be of flammable material. As such, adequate
protection should always be used.
a)
b)
Figure 4 – Minimum distances from all surfaces: a) upper view of the unit's
installation; b) side view of the unit's installation
Warning!
Keep combustible and flammable materials at a safe distance.
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cbp matic 24Cbp matic 30

Tabla de contenido