Brita PROGUARD Coffee Manual De Instrucciones página 53

Ocultar thumbs Ver también para PROGUARD Coffee:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 211
5.2 Installation and Putting The System Into Operation
Step
Preparation and positioning
#1
• Make sure all installation requirements are met (see chapter 4: Installation Requirements)
• Use the App to determine the suitable type and size of the pre-filter
• Use the App to determine the recommended bypass setting of the pre-filter head
• In case the App indicates the need of an electric booster pump, further information about
it can be found in chapter 5.3: Specification and Installation of an Electric Booster Pump.
1.1
Make sure to have sufficient space available for PROGUARD Coffee and its pre- and
post-filter at the intended place of operation
1.2
EN
53

Publicidad

Tabla de contenido
loading

Tabla de contenido