Codice/Code 8114300
Modello/Model MURELLE HE 25 ErP
Matricola/Serial n. 9999999999
PAR 1 = 3 (G20) / 9 (G31)
PAR 2 = 5
4.5
MAINTENANCE (fig. 20)
To. guarantee. functioning. and. efficiency. of.
the. appliance,. in. respect. of. the. legal. pro-
visions. in. force,. it. must. be. regularly. che-
cked;.the.frequency.of.the.checks.depends.
on.the.type.of.appliance.and.the.installation.
and.usage.conditions.
In.any.case,.it.should.be.inspected.at.least.
once.a.year.by.a.qualified.technician.
During maintenance operations, it is
important to verify that the drip-plate
with drain trap contains water (this check
102
ATTENTION
Before removing or refitting the front
panel of the boiler, open the small
upper plastic door.
is particularly important if the generator
has not been used for extended periods
of time).
If necessary, the drip plate can be filled
using the tap provided (fig. 20).
5
4.5.1
Chimney sweep function (fig. 21)
To. check. boiler. combustion,. press. the.
3
installer's.
key.
for. a. few.
seconds..
.
chimney.sweep.function.will.switch.on.and.
1
will.continue.for.15.minutes.
From. that. moment,. the. boiler. will. start.
2
The.
Fig..19
Fig..20