2.13.2 Emptying Operations - Sime BRAVA ONE OF ErP Serie Manual De Instalación Y Mantenimiento

Calderas murales de baja temperatura
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2.13.2 EMPTYING operations

Domestic hot water circuit:
– close the domestic hot water circuit isolation valve
(prearranged in installation)
– open one or more than one hot water valve to fill and bleed the
domestic hot water circuit.
Boiler:
– loosen the automatic bleed valve (3)
– close the heating circuit isolation valves (prearranged in
installation)
– check that the filling valve (4) is shut-off
– connect a rubber hose to the boiler drain valve (7) and open it
– when it has fully emptied, close the drain valve (7)
– close the automatic bleed valve (3).
78
3
7
4
Fig. 27
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Brava one 25 of erp

Tabla de contenido