6.12.2 Emptying Operations - Sime ESTELLE HE 3 ErP Manual De Uso, Instalación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN

6.12.2 EMPTYING operations

Prior to performing drainage operations, check that the sys-
tem's main switch is set to "OFF" and that the master switch of
the boiler is set to 0 ("off"):
– check that the water system isolation devices are closed
Fig. 34
– connect a funnelling pipe to the system's drainage valve (1)
and open it.
When it has fully emptied, close the system drain valve (1).
86

Publicidad

Tabla de contenido
loading

Tabla de contenido