Installation, use and maintenance manual
5

INSTALLATION AND HOOK-UPS

WARNING: the product must be installed,
commissioned
authorised, qualified personnel. Do not
attempt
to
install
yourself.
5.1

Preparing the installation site

The product must be installed in a suitable place,
where the normal use and adjustment operations
can be performed, as well as routine and non-
scheduled maintenance.
The necessary operating space must be prepared,
making reference to the measurements shown in
Fig. Fig. 2.
Y1
X1
≥500 kg
Fig. 6 – Clearances
Model
X1
mm
650
ECOMAXI 160 ErP
The space must also be:
equipped with suitable water mains and
electricity supply lines;
equipped
with
condensate outlet;
equipped with suitable water outlets in case of
damage to the boiler, the safety valve being
tripped or breakages in the pipework or
connectors;
equipped with any containment systems in
case of serious water leakages;
sufficiently lit (as required);
20 m
in volume, as a minimum;
3
dry and sheltered from frost.
and
maintained
by
the
product
by
X3
X2
X2
X3
Y1
mm
mm
mm
650
200
300
a
connector
for
WARNING:
vibrations from spreading, do not install
the
wooden beams (e.g. in the attic).
5.2

Air ventilation connections

The heat pump requires adequate air ventilation,
in addition to the clearance spaces specified
under 5.1.
Create a specific air duct as shown in figure 3 and
4.
Outsi
de
Fig. 7 – Example of air ducting for the model with upper
Outsi
de
the
Fig. 8 – Example of air ducting for the model with additional
MANUAL CODE: 6328407
To
prevent
mechanical
appliance
on
structures
outlets (standard)
rear outlets (optional)
with