Wiring Diagrams For Different Circuits; Initial Start-Up - Sincro SK 400 Manuale Di Uso E Manutenzione

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH

6.4.5 Wiring diagrams for different circuits

In the appendix of this manual there are diagrams for any
connections other than the factory star-series connection
(standard unless otherwise specifi ed on order).

6.4.6 Initial start-up

Before starting up the generating set check that all external
connections are in order and that the protections are in
place. During the initial start-up pay particular attention for
any unusual noise that might signal an incorrect alignment
between engine and generator.
Do not touch the generator while in operation
and immediatly after the generating set has
!
stopped, since certain parts may still be
WARNING!
very hot.
Generators are rotating electrical machines that involve
potentially hazardous live or moving parts, therefore the
following is strictly prohibited:
an improper use;
removal of covers and disconnection of safeties
The lack of routine check-ups and poor
maintenance can cause severe damage to
!
persons and/or objects.
WARNING!
Due to these inherent hazards, all work of an electrical
or mechanical nature must be carried out by qualifi ed
specialists.
26

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sk 450Sk 400 sx-4F091984

Tabla de contenido