Instrument Construction; Operation; Charging And Changing The Battery Pack; Turning The Pump On - MSA TOXIMETER II Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23

3 Instrument Construction

Tube receptacle,
outlet port, blue
arrow
Acoustic signal
transmitter
Liquid Crystal
Display
Changeable
battery pack

4 Operation

4.1 Charging and Changing the Battery Pack

Fully charge the battery pack before first use. Ma-
ximum of capacity is reached after approx. five
chargings.
MSA DELTA charger:
MSA OMEGA II charger: charging time approx.
MSA OMEGA charger:
Charging the battery pack in potentially
explosiveatmospheres is prohibited!
The intrinsically safe battery pack can be changed
in hazardous areas. The battery pack can be
charged while attached to the pump or separated
from it.
By pressing the lock PRESS the empty battery
pack can be detached and replaced by a charged
one.
Before each use the charge status should be
noted!
6
Tube receptacle, inlet
port, white arrow
Visual signal transmitter
Fixture to break off
tube tips
Push button switch,
black, select function
Push button switch,
yellow, confirm function
Lock/unlock of
battery pack
Jack for OMEGA
charger
charging time approx.
3.5 h, then trickle charge
7 h, longer charge can
damage the battery
pack!
charging time approx.
10 h

4.2 Turning the Pump On

The TOXIMETER II is turned on with the black
push button. After self-check and flushing of the
flow path the main menu DETECT is shown.
The activation of a push button switch is
confirmed by an acoustic signal. The end of a
measurement is indicated visually and
acoustically. During the measurement a tube
symbol flashes on the display.
5 Measurement With Detector
Tubes
GB
Fig. 1: Changing battery
Fig. 2: Box and detector
tube with application notes
Fig. 3: Opening the
detector tubes
GB

Publicidad

Tabla de contenido
loading

Tabla de contenido