Orbegozo FDI 94 Manual De Instalación página 67

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FDI 94 FDI 124 FDI 184 FDI 244 MANUAL DE INSTALACIÓN
TEST RUN
Before Test Run
Only perform test run after you have completed the following steps:
• Electrical Safety Checks – Confirm that the unit's electrical system is safe and operating properly
• Gas Leak Checks – Check all flare nut connections and confirm that the system is not leaking
• Confirm that gas and liquid (high and low pressure) valves are fully open
Test Run Instructions
You should perform the Test Run for at least 30 minutes.
Connect power to the unit.
Press the ON/OFF button on the remote controller to turn it on.
Press the MODE button to scroll through the following functions, one at a time:
COOL – Select lowest possible temperature
HEAT – Select highest possible temperature
Let each function run for 5 minutes, and perform the following checks:
67

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fdi 124Fdr 184Fdi 244

Tabla de contenido