2- New Pecus Update For New Pecus G2 - Nogueira PTN-1000 G3 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Preparation

4.2.2- NEW PECUS update for NEW PECUS G2

Remove the 2 bolts (E);
1.
Remove the cover (F)
2.
Remove the cutting gears (G);
3.
Remove the box (H);
4.
Remove the bearing support "shackle" (I);
5.
Remove the 3 bolts (J);
6.
Remove the bearing assembly (K);
7.
NOTE!
The support (K) will no longer be used.
Remove the 4 bolts (L) on each side of the
8.
cover (M);
Remove the 3 bolts (N);
9.
Remove the cover (M);
10.
26
Instructions Manual

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido