Power Supply Connections - MBM FTBG74A Manual De Uso E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
and description on page 2), to people
who transit and / or operate within the
work environment.
To place the equipment adherent each
other perfectly (part G). Level the equi-
pment as described above (detail E).
Remove the protective caps (part H2).
Insert the screws in their housings and
lock the two structures with the locking
nuts (part H1-H3). Replace the pro-
tective caps between the devices (part
H2). Repeat, if necessary, the sequen-
ce of leveling and fixing operations for
the remaining equipment
If necessary, repeat levelling and fixing
operation sequence for the remaining
Before proceeding with the
operations, see "General sa-
fety information".
These operations must be
performed by qualified and
authorised operators, in ac-
cordance with the laws in force and
using the appropriate materials de-
scribed.
Generally, the appliance is
delivered
mains supply cable, without
pipes for connection to the water,
drainage and gas networks.
GASPOWER CONNECTIONS -
see SECT. IMAGES - REF. e).
Features of the installation site /
The premises for installation of the ap-
pliance (type A1 under hood) must be
equipped with features such as:
Air premises according to the provi-
sions required by the local regulations
in force. The extraction hood above
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
POSITIONING AND HANDLING

POWER SUPPLY CONNECTIONS

without
electric
- 10 -
equipments.
INTRODUCTION
(OPTIONAL) see SECT. IMAGES
- REF. d). / In order to introduce the
terminal, position it and fix it with the
equipped screws provided (detail L1).
Once the described operations have
been carried out, position again the
panels and knobs of the different ap-
pliances in the respective housings.
the appliance must be in operation du-
ring use of the appliance itself.
The distance between the appliance
and the filter of the extraction hood
must be at least 20 cm.
Once the appliance is con-
nected to the power and drain
sources, it must remain static
(fixed) in the place of use and main-
tenance.
A safety valve must be installed
on the network upstream of the
main supply line. It must be ea-
sily identifiable and accessible by the
operator (Fig. 3)
To make the connection to the
mains, it is necessary to have
a hose conforming to the local law
in force and with the characteristics
specified in EN ISO 228-1 or EN
10226-1 / -2.
The gas supply pipe must com-
OF
TERMINAL
4.

Publicidad

Tabla de contenido
loading

Tabla de contenido