Operation Procedure
5 – 2 Starting operation
Follow the instructions in "8 – 3 Programming the system operation" and set items such as handpiece gear ratio,
maximum rotation speed, direction of rotation, torque upper limit, coolant solution flow level, and light level in advance�
Select coolant solution flow
level
When you press and hold the button
for more than 2 seconds, the
operation between this product and
the linked device switches�
1
Turn on the power switch of the control unit�
"CONNECT" is displayed on the LCD display as shown
in the figure below, and it is automatically connected
to the paired device�
When the foot control is connected, the normal
screen is displayed� If it is not switched to the normal
screen, see "9 – 2 Problems and solutions�"
Speed control pedal
2
Press
3
Confirm settings such as gear ratio, maximum
rotation speed, direction of rotation, torque upper
limit, coolant solution flow level, and light level and
change them as necessary�
4
Depress the pedal on the foot control to activate the
motor�
20
Select a program number
When you press and hold the button
for more than 2 seconds, goes back
one�
Change direction of rotation
When you press and hold the button
for more than 2 seconds, the motor
LED illuminates while the button is
depressed�
to select a program number�