Components For Correct Installations With Submerged Electric Pumps; Electrical Installation - Lowara ResiBoost MMW Manual De Instalación, Funcionamiento Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 90
Number
Component
9
Pressure trans-
ducer
10
Non-return
valve
11
Gate valve
12
Diaphragm
tank, minimum
8 liters
13
Converter
14
Converter pow-
er panel
15
Power panel
with high sensi-
tivity differential
switch (30 mA).
See
Electrical
requirements.
16
Storage tank
17
Float switch
18
Filter for motor
cable over 30 m
in length.
4.3.3 Components for correct installations
with submerged electric pumps
See
Figure 26
,
Figure 27
29
.
Number
Component
1
Electric pump
2
Cable clamp
3
Motor power ca-
ble
4
Level probes to
prevent dry run-
ning (or other
level control
sensor)
5
Mounting brack-
et
6
Non-return
valve
7
Pressure gauge
8
Pressure trans-
ducer
9
Gate valve
10
Diaphragm
tank, minimum
8 liters
11
QCL5 control
board for level
probes
Included in the
kit
,
Figure 28
, and
Figure
Included in the
kit
Number
Component
12
Filter for motor
cable over 30 m
in length.
13
Converter
14
Converter pow-
er panel
15
Delivery pipe
16
Electric pump
bleed / priming
cap
17
PTC or PT1000
(available only
with some mod-
els of the sub-
merged motor)
18
Power panel
with high sensi-
tivity differential
switch (30 mA).
See
Electrical
requirements.
19
Quick coupling
(provided for
fastening the
converter on the
pump)
The following notes and recommendations refer to
Figure 26
,
Figure 27
,
Figure 28
A. Distance between the clamps that secure the
drop cable to the delivery pipe.
B. Distance from the bottom of the well to the elec-
tric pump.
Recommendations:
• Non-return valve at 10 m distance from the deliv-
ery flange, plus an additional non-return valve
every 30-50 m of piping.
• Secure the drop cable to the pipe every 2 to 3
metres of piping.
• Make sure the electric pump is installed at a safe
distance from the bottom of the well.
• Make sure there is a minimum distance of 3 mm
between the diameter of the pump and the inter-
nal diameter of the well.
• During operation, make sure that the water circu-
lation speed around the motor is at least 8 cm/
sec.
• Make sure that the minimum dynamic level of the
water in the well is at least 1 m above the pump's
delivery flange.

4.4 Electrical installation

Precautions
WARNING:
• Make sure that all connections are
performed by qualified installation
en - Original instructions
Included in the
kit
, and
Figure 29
.
29

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Resiboost mtwResiboost mmaResiboost mta

Tabla de contenido