Installation
Begin the installation of the door by checking the opening. It must be the same size as the door. Vertical jambs must be plumb and level with header. Side clearance, from
edge of door to wall, must be a minimum of 3-1/2" (89mm) on each side.
IMPORTANT: STAINLESS STEEL OR PT 2000 COATED LAG SCREWS MUST BE USED WHEN INSTALLING CENTER BEARING BRACKETS, END BRACKETS, JAMB BRACKETS,
OPERATOR MOUNTING/SUPPORT BRACKETS AND DISCONNECT BRACKETS ON TREATED LUMBER (PRESERVATIVE-TREATED). STAINLESS STEEL OR PT 2000 COATED LAG
SCREWS ARE NOT NECESSARY WHEN INSTALLING PRODUCTS ON UN-TREATED LUMBER.
NOTE: It is recommended that 5/16" lag screws be pilot drilled using a 3/16" drill bit prior to fastening.
1
Attaching Quick Install Flag
Angle to Vertical Track
NOTE: If you have fully adjustable flagangles, skip
Tools Needed:
this step and complete Step 2.
None
Place the lower quick install tab of the flagangle in
the quick install feature of the vertical track. Give the
flagangle 1/4 turn to lock in place. Repeat for other
side.
NOTE: After completing this step, continue with Step
3.
Please Do Not Return This Product To The Store. Contact your local Wayne Dalton dealer. To find your local Wayne Dalton dealer, refer to your local
yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com.
QUICK INSTALL TAB UNLOCKED
FLAGANGLE
VERTICAL
TRACK
LEFT HAND TRACK AND FLAGANGLE
QUICK INSTALL TAB LOCKED
FLAGANGLE
VERTICAL
TRACK
RIGHT HAND TRACK AND FLAGANGLE
7