Eaton Powerware 9125 Guia De Instalacion página 20

Ocultar thumbs Ver también para Powerware 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
The following steps explain how to install the UPS rail kit.
NOTE All hardware (screws, clip nuts, etc.) referenced in Steps 2 through 4 are contained
in the rail hardware kit.
1.
2.
3.
NOTE Do not tighten the screws until the UPS or EBM is installed.
6
EATON Powerware
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 4).
Rear Hold-Down Bracket
Rear
Assembly Wing Nuts
Figure 4. Adjusting the Rail Depth
Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
Secure both rails to the front of the rack with pan-head screws.
Insert the screws through the center holes of the rail (see Figure 5).
Figure 5. Securing the Front Rail
®
9125 (9910-P30) UPS Installation Guide for IBM
®
S
Applications
164201636 Rev A
Front

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p30

Tabla de contenido