OPERATION
3
Press the Test/Alarm Reset
button to toggle an option
on or off.
38
EATON Powerware
Test/Alarm
Reset Button
Press the On button to
scroll to the next option.
Figure 39. Using Configuration Mode
®
9125 (9910-P30) UPS Installation Guide for IBM
Bar Graph Indicators
1
&
4
Press the On and Test/Alarm Reset
buttons simultaneously to toggle between
Configuration and Operation modes.
On Button
2
®
S
Applications
164201636 Rev A