Eaton Powerware 9125 Guia De Instalacion página 26

Ocultar thumbs Ver también para Powerware 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
5.
6.
12
EATON Powerware
UPS with EBM: Place the UPS cabinet horizontally so that the left
end of the unit is accessible (see Figure 15).
Figure 15. Installing UPS Pedestals
Place the EBM cabinet upside down so that the right end of the unit
is accessible (see Figure 16).
Figure 16. Installing EBM Pedestals
UPS with PDM: Place the PDM cabinet horizontally so that the left
end of the unit is accessible (see Figure 17).
Figure 17. Installing PDM Pedestals
Place the UPS cabinet upside down so that the right end of the unit
is accessible (see Figure 18).
Figure 18. Installing UPS Pedestals
®
9125 (9910-P30) UPS Installation Guide for IBM
®
S
Applications
164201636 Rev A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p30

Tabla de contenido