Power Connections and Startup

The device power cord connection(s) determines if the setup can
provide dual-redundant power to the protected device(s). See Figure 28
for a non-redundant powered device; Figure 29 for a dual-redundant
powered device; or Figure 30 for a UPS providing non-redundant power
to a device with redundant power supplies.
20
EATON Powerware
Reconnect the REPO connector to the REPO port.
Verify that the externally-connected REPO switch is not activated to
enable power to the UPS output receptacles.
Plug in the UPS and start the UPS by pressing the On button.
Activate the external REPO switch to test the REPO function.
De-activate the external REPO switch and restart the UPS.
Legend (Figure 28, Figure 29, and Figure 30)
UPS to utility (mains) power cord.
1
Device to UPS power cord.
2
Device to utility (mains) power cord.
3
®
9125 (9910-P30) UPS Installation Guide for IBM
Pin 1
Pin 2
Figure 27. REPO Connector
®
S
Applications
164201636 Rev A