Eaton Powerware 9125 Guia De Instalacion página 21

Ocultar thumbs Ver también para Powerware 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4.
Using two clip nuts and two pan-head screws, attach the rail to the
rear of the rack (see Figure 6 and Figure 7).
The bottom rail uses position 2 and 4 for the rear hex-head screws.
If you are installing additional rails, the next rail should be placed 4
holes above the last installed screw.
5.
Repeat Steps 3 and 4 for the other rail.
®
EATON Powerware
9125 (9910-P30) UPS Installation Guide for IBM
Position 10
Position 8
Position 4
Position 2
Figure 6. Rear Rail Screw Positions
Figure 7. Securing the Rear Rail
®
S
Applications
164201636 Rev A
INSTALLATION
Second Rail
First Rail
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p30

Tabla de contenido