Atmosair Pump Installation; Led Indicators - Getinge Arjohuntleigh AtmosAir 9000A Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 112

AtmosAir Pump Installation

Pump installation
1.
Place pump on a solid stationary surface or suspend on end of bed frame with built-
in hanger.
2.
Attach pump hoses to mattress, as shown with (Figure 1) below:
• Attach hoses to the mattress connectors on the patient left side of the mattress
for alternating pressure.
• Ensure pump hoses are attached to pump.
3.
Ensure air hoses are not kinked and will not be pinched by any articulated bed
mechanisms.
4.
Attach hose connector to the pump.
5.
Plug pump unit into a properly-grounded wall outlet.
6.
Verify power to this outlet is not controlled by a wall switch.
7.
Switch pump on.

LED Indicators

1.
Green LED is lit when the pressure is at the set level.
2.
Yellow LED is lit when the pressure is below the set level. Check connections.
MAX.
MIN.
ALTERNATING PRESSURE
6
Mattress
Connectors
Tag
Figure 1 Mattress Hose Connector
NORMAL PRESSURE
LOW PRESSURE
ON
OFF
POWER
Figure 2 Control Panel
Pump Hoses

Publicidad

Tabla de contenido
loading

Tabla de contenido