Plumb The Instrument - Hach TU5300 sc Manual Básico Del Usuario

Ocultar thumbs Ver también para TU5300 sc:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 61
1. Get the latest software version from www.hach.com. Install the latest software version on the SC
controller before the instrument is connected to the SC controller.
Refer to the software installation instructions supplied in the box or supplied in the software
download for the SC controller.
2. Remove power to the SC controller.
3. Connect the sensor cable to the quick-connect fitting of the SC controller. Refer to
the connector cap for later use.
4. Supply power to the SC controller.
The SC controller looks for the instrument.
5. When the SC controller finds the instrument, push enter.
On the main screen, the controller shows the turbidity value measured by the turbidimeter.
Figure 5 Connect the sensor cable to the SC controller
4.10 Plumbing

4.10.1 Plumb the instrument

Explosion hazard. Make sure that the drain tube is free of all obstructions. If the drain tube has a
blockage or is pinched or bent, high pressure can build up in the instrument.
Personal injury hazard. The sample line contains water under high water pressure that can burn skin
if hot. Qualified personnel must remove the water pressure and wear personal protective equipment
during this procedure.
Do not let water get in the vial compartment or instrument damage will occur. Before the process head is installed
on the instrument, make sure that there are no water leaks. Make sure that all tubing is fully seated. Make sure
that the vial nut is tight. The full water pressure should be on the system, the water flow is on and no water leak
on the glass vial is seen.
W A R N I N G
W A R N I N G
N O T I C E
Figure
5. Keep
English 17

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tu5400 sc

Tabla de contenido